Weather protection roof Gerolzhofen, Germany
Project data
Location: Gerolzhofen, Germany
Building: Temporary weather protection roof with 30 m span for the rehabilitation of a 90 m long production hall
Construction period: 2013
Requirements
- temporary weather protection roof
- very tight schedule for rehabilitation
- short timing for planning, material supply and installation of protective roof construction
- different roof constructions
Customer
Construction company: Eugen Wahner GmbH, Sulzfeld
Customer's benefit
- rehabilitation work regardless of external weather conditions
- protection of working machines
- economical system solution through renting
- late availability in rental warehouse allowed rapid start of assembly
- easy pre-assembly of the LGS segments by hand on the ground
- accelerated economic construction by combining LGS and VARIOKIT
Thorsten Wahner
Site Manager and General Manager
The LGS installation using ridge clasp and roles is absolutely convincing. In addition, PERI engineers demonstrated speed in their planning skills - size, planning, statics and assembly had to be adhered to a tight schedule.
PERI solution
- construction of a weather protection roof on the basis of the LGS Lattice Girder System
- individually opening single roof elements
- project-specific VARIOKIT load-bearing construction
- Combination of LGS Weather Protection Roof on the basis of PERI UP with VARIOKIT Engineering Contruction Kit