Limited crane availability and tight time schedule
Formwork solution to adapt with strong wind conditions

Nabas Windfarm
Aklan, Philippines

LIWA system provided for complex wall layout in remote area with no cranage available.

 

 

 

Location

The Project

Foundation Formwork for Windmill 

Project Information

Related Products

We’d love to hear from you!

Feel free to give us a call at +63 2 8831 8835, extension 120, to discuss your specific requirements in more detail.

Limited crane availability and tight time schedule
Formwork solution to adapt with strong wind conditions
Limited crane availability and tight time schedule
Formwork solution to adapt with strong wind conditions