Cuatro Torres Business Area, Spain
Project data
Location: Madrid, Spain
Three of four high-rise buildings (skyscrapers):
- Torre Espacio: 223 m high, 57 floors, completion 2007
- Torre de Cristal: 249 m high, 52 floors, completion 2008
- Torre Caja Madrid: 250 m high, 45 floors, completion 2009
Requirements
- Torre Espacio:
The initially quadratic floorplan with an elliptical shape runs around the three centrally located cores.
- Torre de Cristal:
Continual floorplan changes with tapering on all four edges.
- Torre Caja Madrid:
Two external reinforced concrete cores with very irregular floorplans and floor levels lying in between them.
Customer
- OHL Group, Madrid (Torre Espacio)
- Dragados (Torre de Cristal)
- ARGE Torre 1, FCC/Dragados (Torre Caja Madrid)
Customer's benefit
- adherence to the tight schedule
- system solution for the different requirements of the project
Rafael Ruiz | Luis Redondo | José Luis Martín
Site Manager Torre Repsol | Site Manager Torre de Cristal | Site Manager Torre Espacio
The formwork solution developed by PERI and the ACS self-climbing system function excellently. Once again, PERI has proven its strengths regarding quality and service.
Due to the use of the ACS and SKYDECK systems, our site is a prime example of efficiency and safety.
From the beginning, our cooperation with PERI has been outstanding. And with TRIO, PERI UP, SKYDECK and ACS we were able utilise high-performing systems. Here PERI has once again proven its leading position.
PERI solution
- Torre Espacio:
ACS P climbing system for the striking of the 450 m² wall and slab in one work step including a central placing boom.
- Torre de Cristal:
ACS R, ACS P, ACS G climbing systems in combination with1,150 m² VARIO GT 24 wall formwork distributed across 10 climbing groups.
- Torre Caja Madrid:
ACS climbing system in combination with VARIO GT 24 wall formwork with a water stop to enable placing booms to reach the target of a weekly cycle.